Critical Path Analysis 143 620 PEN 3:LOCATE 1,9:PRINT"The goal migh t be the completion of a large project or, more simply,arrival ata distant met ro station by the shortest possible rout e.":PEN 1 630 LOCATE 1,14:PRINT CHR$(24)" This pro gram is suitable for both cases":PRINT C HR$(24) 640 LOCATE 1,16:PEN 2:PRINT"A demonstrat ion network is shown and theprogram wil I trace out all possiblepaths throug h the network,indicating thelongest and shortest routes.":PEN 1 650 PEN 3:LOCATE 15,22:PRINT"PRESS ENTER ":PEN 1 660 X$=INKEY$:IF X$<>CHR$(13) THEN 660 E LSE CLS 670 WINDOW #1,1,40,1,25:PAPER #1,0:CLS # 1 680 WINDOW #0,5,36,1,25:PAPER #0,0:PEN # 0,1:CLS #0 690 PLOT 70,310:DRAWR 46,64 700 DRAWR 320,0:DRAWR 84,-32 710 PLOT 70,310:DRAWR 96,32:DRAWR 352,0 720 PLOT 70,310:DRAWR 144,0:DRAWR 48,32: DRAWR 224,0 730 PLOT 70,310:DRAWR 64,-20:DRAWR 160,0 :DRAWR 64,20 740 PLOT 168,342:DRAWR 48,32 750 PLOT 312,376:DRAWR 32,-32:DRAWR 16,- 32:DRAWR 16,-32 760 DRAWR 144,64:REM DRAWR -80,2 770 PLOT448,312:DRAWR -96,2 780 LOCATE 4,2:PRINT CHR$(24)"4":LOCATE 10,2:PRINT"5":LOCATE 16,2:PRINT"6":LOCAT E 24,2:PRINT"11":PRINT CHR$(24) 790 LOCATE 1,6:PRINT CHR$(24)"1":LOCATE 7,4:PRINT"2":LOCATE 13,4:PRINT"3":LOCATE 18,4:PRINT"7":LOCATE 29,4:PRINT"12":PRI NT CHR$(24) 800 LOCATE 19,6:PRINT CHR$(24)"8":LOCATE 25,6:PRINT"10":LOCATE 20,8:PRINT "9":PR INT CHR$(24)